What problems should pay attention to the decoration acceptance check that needs to be presented during the renovation and acceptance?

Now many family decoration will ask the decoration company design and construction. After the renovation, the owners will receive acceptance associated with the renovation renovation Acceptance allows you to sign, then the acceptance of a single decoration are what need to pay attention to it?

What is the decoration acceptance order that needs to be presented when the decoration is accepted?

After the decoration company fills in the decoration acceptance form, it will be submitted to the filing authority and accepted by the special engineering acceptance organization. After the acceptance is completed, the owners only need to check each item carefully, after checking the undoubted, on the decoration acceptance report. Signed and sealed. It is a written commitment to the owner that the signing of the decoration company's decoration project is qualified.

Decoration acceptance construction overview

The construction overview of the completion acceptance list shall indicate the scope of renovation construction, the personnel required for construction, construction drawings, construction materials, and so on. Construction basis: design drawings and drawings of the minutes and construction contact list; national and local current construction acceptance standards and mandatory provisions. The construction quality of the construction phase must be controlled within the qualified range. Otherwise, the owner has the right not to sign.

Decoration acceptance engineering

The project outlines that must be specified on the decoration acceptance list include the project name, construction unit, supervision unit, construction unit, and construction area. The owners are reviewing the project overview of the completion acceptance report. A general look at it is sufficient. The main thing is fine. Look at the specific construction below.

Engineering Quality Assessment

The decoration and acceptance checklist shall indicate in this part which parts of the completion project, including decoration engineering, electrical engineering, water supply and drainage engineering, and outdoor engineering. Finally, there will be a summary of the completion acceptance report. All these submitted contents will be reviewed by the relevant owners, supervisors, leaders of quality inspection stations and experts. After the final acceptance, it is signed by the owner. Therefore, when the owner looks at the decoration acceptance checklist, he must be careful and confirm it before signing.

Summary: The above is the analysis of the decoration acceptance order that Xiaobian needs to present when accepting the decoration, as well as what issues to pay attention to during the acceptance inspection. I hope to help everyone, and more information is provided on this site.

Decoration decoration company okay decoration materials brand home improvement decoration steps decoration materials knowledge

OTIS Elevator Spare Parts

OTIS Elevator Spare Parts, OTIS Elevator Parts

XiziOTIS Elevator Spare Parts, XiziOTIS Elevator Parts


Otis is the world's largest manufacturer and maintainer of people-moving products, including elevators, escalators and moving walkways. Founded more than 160 years ago by the inventor of the safety elevator, Otis offers products and services through its companies in more than 200 countries and territories, and maintains approximately 1.9 million elevators and escalators worldwide. Otis is a unit of United Technologies Corp., a leading provider to the aerospace and building systems industries worldwide


People Nearly 66,000 employees globally with approximately 1,000 branch offices
Revenue $12 billion in 2015
Installed Base

Approximately 2.6 million Otis® elevators and escalators in operation worldwide

Service Base Approximately 1.9 million elevators and escalators serviced by Otis worldwide
Countries Products sold and serviced in more than 200 countries and territories
Manufacturing Major manufacturing facilities on four continents
Engineering and Test Centers

Otis has a network of research and engineering facilities and test towers around the world

Company's two tallest elevator test towers are located in Shibayama, Japan (505 feet or 154 meters above ground; 89 feet or 27 meters below ground) and Bristol, Conn., United States (384 feet or 117 meters above ground)

OTIS Elevator Spare Parts,OTIS Elevator Parts

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjelevatorcontrolsystem.com