Vertical pipeline pump stop operating requirements

[Asia pump network hearing] stop operation is vertical pipeline pump operation flow among the last operation flow, then in the operation, what kind of requirements? The following is about the vertical pipeline pump stop operation requirements. Vertical pipe pump stop operation requirements 1) Close the discharge pipe valve. 2) Stop the motor. 3) Close the inlet valve. 4) If long-term shutdown, the pump liquid should be depleted. Above is the vertical pipeline pump in the stop operation requirements, hope that in practical applications, the above content is helpful to everyone. Read more: China Building Water Exhibition Pump Valve Tube Fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Expo Industry Interconnection (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Duanhui (QQ / WeChat:) http://beng.liuti.cn/ (service hotline:)

Water Level Meter

The steel ruler water level meter is the most accurate way to measure the water level. A metric or imperial scaled steel ruler attached to a probe that is mounted on a metal or plastic steel. It is usually used to measure the water level in wells, boreholes and water level pipes. It is especially suitable for the observation of groundwater level in hydropower projects or the manual inspection of dam body immersion lines of earth and rock dams. The devices are characterized by a simple, fast and reliable measurement acquisition.

Water Level Meter,Water level indicator, level meter, deep well water level meter

Xi'an Gavin Electronic Technology Co., Ltd , https://www.gamicos-meas.com