New home decoration new house renovation process

1. Pre-design - 2. The main demolition - 3. Hydroelectric reform - 4. Carpentry - 5. Tiling - - 6. Brush wall paint - 7. Kitchen ceiling - 8. Cabinet installation - - 9. Wood door installation - 10. Floor installation - 11. Paving wallpaper - 12. Radiator installation - 13. Switch socket installation - 14. Lamp installation - 15. Hardware sanitary installation - - 16. Curtains Rod installation - 17. The pioneering cleaning - 18. Furniture approach - 19. Appliance installation - 20. home accessories

First, understand more choice of decoration company

Organize and envisage: Harmonize the ideas and opinions of family members, read more information and cases, and initially determine the style.

Prepare the budget: According to the family financial situation, initially determine the decoration budget and play affluent. Determine the ceiling for the foreseeable infrastructure projects such as decoration and main materials and strictly implement them.

Tip: It is normal for the final budget to exceed 10% of the budget, and 30% is not new!

Choice method: Bao Qinggong is the most tired, the most irreproachable material is package material, or the main material is self-purchased, others let decoration company get it!

Select the company's two methods for reference: a commissioned by the supervision company bidding;

b Looking directly into the home improvement market to find a home improvement company;

prompt:

Looking directly into the home improvement market to find a home improvement company is a common practice. An intuitive comparison can be made between the home improvement company and the designer's capabilities. The form of bidding for the entrusted supervision company has not been generally accepted by the market. The reputation of the supervision company is on the one hand, and the second one is mostly a public company. In the home improvement market, there is still a gap between brand appeal and some home improvement companies. Regardless of which of the above options is chosen, Jia Yi suggests that you should never choose a street decoration team. Otherwise, the legacy will be endless.

Second, negotiate and finalize the renovation program

The design plan makes requirements, draws sketches, communicates fully, measures on the ground, provides construction and renderings, and prepares and provides a budget for decoration.

prompt:

1, most home improvement companies do not charge a separate design fee, but the design will be somewhat routine, form a routine.

2. Some companies have fee designers. If you want to show your personality and have ample funds, you can ask them to design them individually, not only because these designers are generally senior designers, but also provide supervision and guidance for your home improvement. General charges of 2000-3000 yuan, is still worth the money.

Third, sign the decoration contract

Sign the contract to determine the renovation program and timber, determine the project budget, determine the duration, and sign the contract.

prompt:

1. The budget provided by the home improvement company at this time is only the foreseeable project budget, and structural demolition, walk-and-route wiring, gypsum ceilings, and lamp installations are required to be calculated by actual measurement after completion of the phase project. Remember!

2. Beware of the over-reporting of false reports by the home improvement company in the budget. It is suggested that the project budget should not be confirmed on the spot, and it is best to measure and recalculate the audit on its own.

3. Carefully read the contract. If the rights and powers of the article are unclear, it should be requested to clearly explain or sign a supplementary agreement on the spot.

4. The signed contract shall be a contract standardized and unified by the relevant state agencies. After the signing, the contract shall be verified or stamped by the market to determine the validity of the contract.

IV. Construction, invite people or personally supervise workers

ready

1. Testing of homes - flatness of walls, floors, roofs, and water supply and drainage pipes.

2. Check the flow of electricity and gas, and make records

3. Material preparation.

4. Personnel scheduling. Determine the construction personnel and specify the person in charge of the site.

5. Factory and site staking. Show construction drawings, construction requirements.

Decoration company's construction process

1. Demolition of a demolition project: If it is structural, it must be completed. Handling: Dismantled rubbish and waste materials. Clean up: Do construction site cleaning.

2. Hydropower Coal Project

A. The discharge of hot and cold water pipes and the installation of water supply equipment.

B. Emissions of power lines, electrical appliances, telecommunications, and lighting lines shall be determined. The position of the cassette is determined, and the installation and installation of the line box switch sockets.

C. Drain installation of gas pipelines and gas appliances.

3. Masonry project A. Masonry bricks, partition walls, doors and windows B. Stucco. C. drying rack installation.

4. Metalworking A. Aluminum alloy doors and windows, plastic doors and windows installed. B. Anti-theft doors and windows, canopy installation. C. Clothes hanger installation.

5. Woodworking A. Production of wood products: door and window covers, wall panels, vertices, ceiling partitions, kitchen utensils, entrances, etc.

B. Soft-bed furniture production (closet, bookcase, TV cabinet, shoe box, etc.).

C. laying floor, baseboard (board). D. Mosaic of glass products.

6. Finishing works paste wall, top paper (cloth), soft decoration production.

7. Paint Engineering A. Batch wall, top putty, paint. B. Wood product batch putty. paint. C. floor, baseboard (board) paint. D. Wall top paint latex paint.

8. Installation project

A. Electrical switch, socket panel installation, lighting installation.

B. Door locks, doorbells.

C. Sanitary ware three-piece sets and hardware accessories (faucet, soap jar, towel rack, paper box, bathtub handrail, mirror glass)

D. Soot trimmer, water heater, exhaust fan.

prompt:

1. The project of each stage is different, with the emphasis on the confirmation of timber, on-site supervision of key parts, and field inspection and acceptance.

2, strictly control the progress of the project, choose to purchase the main and auxiliary materials in advance, to avoid delays in the construction period.

3, gas, steel, flooring and other construction projects that require manufacturers should be coordinated with the decoration team in advance to determine the details of the program to avoid mutual problems.

V. Special person or personal acceptance and renovation

Overall acceptance and refurbishment of space

1. Clearing up, the decorated room is cleaned and cleaned one by one.

2. Accept acceptance according to the acceptance criteria (if rectification is required, perform another inspection).

3. Provide the circuit diagram of the pipeline, the product warranty card.

4. According to the actual decorating project volume for total settlement, invoice will be issued.

5. Issued to the decoration project credit project warranty card.

prompt:

Don't just look at the big side, corners are the key, especially the intersections of different corners and different materials. If problems are found at this time can still be solved immediately, otherwise it will only wait for after-sales service.

Six, the cost of settlement

prompt:

1. Carefully review all kinds of expenses calculated according to actual measurements, and recheck all expenses according to the budget table to avoid double counting. According to the contract paid to the decoration company costs.

2, we must consider the issue of the warranty period. Pay most of the renovation money first. It is best to settle all costs after the warranty period expires.

Seven, warranty, pay the cost.

After the renovation of the service, after the warranty and decoration company settled the full cost.

Seven, warranty, pay off the cost

If the decoration company has promised after-sales service, we must pay attention to the best warranty and then recoup the entire cost of the decoration company.

Children's Room Decoration Study Decoration Home Decoration Design Paint Window Outlet Home Improvement Budget Table Decoration Project Budget Table Decoration Ceiling Effect Drawing Decoration Decoration Company Decoration Decoration Effect Picture TV Cabinet Decoration Effect Picture Partition Decoration Effect Picture Home Decoration Effect Picture Decoration Partition Entrance Decoration Effect Figure decoration style home wallpaper TV wallpaper glass brick cabinet door home cabinet kitchen ceiling partition cabinet wall cabinet floor tile glass furniture partition door glass door home decoration home decoration home

High Speed Stacking Door

The quick stacking door has many functions such as heat preservation and cold preservation, insect and wind prevention, dust insulation and sound insulation. Widely used in underground parking lots, industrial plants, food, textiles, electronics, printing and packaging, automotive assembly, precision machinery, logistics and warehousing and other places.

Automatic Stacking Doors,High Speed Security Door,Rapid Stacking Folding Door,Automatic Stacking PVC Door

Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.pvchighspeeddoor.com