The kitchen is the most humid place in the whole home. What is the main attention in the decoration process? The following is a detailed look at the steps of the kitchen ceiling . Integrated ceiling construction technology: (1) According to the design elevation of the suspended ceiling, the line shall be stretched around the wall. The bullet line shall be clear and the position shall be accurate. The horizontal allowable deviation shall be ±5mm. (2) A fixed angle of aluminum along the elevation line, the role of angle aluminum is the sealing of the edge of the ceiling. The common specification of angle aluminum is 25*25mm. Its color should be the same as the aluminum alloy panel, and the angle aluminum is mostly fixed on the wall column with cement nails. (3) Determine the keel position line, because each aluminum buckle plate is a molded veneer, generally can not cut the block, in order to ensure the integrity of the ceiling finish and installation reliability, according to the size of the aluminum buckle plate ( This project uses the 300*300mm specification) and the area size of the ceiling to arrange the structural dimensions of the ceiling frame. The basic layout of the aluminum buckle plate is: When the plate combination is complete, when the edge is surrounded by the edge, the edges of the edge must be symmetrical and uniform, and the position line of the arranged dragon skeleton should be drawn on the upper side of the elevation line. (4) The distance between the main keel lifting point should be selected according to the design recommendation series. The middle part should be arched. The height of the keel arching should not be less than 1/200 of the room surface span. Correct the position and height of the main keel after installation. To control the smoothness of the skeleton of the dragon, firstly pull out the vertical and horizontal control lines, and from one end, adjust the suspending height of the boom while installing it. After the large surface is flattened, some single keels with curved edges and edges are adjusted until they meet the requirements. (5) The boom should be straight and have sufficient bearing capacity. When the boom needs to be long, it must be welded firmly and the weld is even and full. For anti-rust treatment, the boom should not exceed 300mm from the end of the main keel. Otherwise, a boom should be added to prevent the main keel from falling. The secondary keel (below the middle keel or small keel) should be installed close to the main keel. (6) Completely correct the position and level of the primary and secondary keels. The connectors shall be installed in a wrong position. Check the installed ceiling frame. It shall be firm and reliable. Only after complying with relevant regulations can the next construction be carried out. (7) When installing the square aluminum buckle plate, the minor bone should be straightened. The buckle plate shall be flat and shall not warp. The error of the flatness of the ceiling shall not exceed 5mm. Information on the installation process of kitchen ceilings was introduced here. I hope this article will be helpful to everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible. Top ten brands of integrated ceilings Matters needing attention when installing integrated ceiling type Yuba Types of gypsum board ceilings Advantages and disadvantages of gypsum board Home decoration kitchen ceiling feng shui stress Ceiling kitchen ceiling integrated ceiling kitchen integrated ceiling home decoration home decoration Furniture brushed with paint, in order to prevent the paint from cracking when exposed to the sun Decorating Tools,Smart Roller,Fillable Paint Roller,Patterned Paint Roller Behappy Crafts (suzhou)Co.,Ltd , https://www.craftsbehappy.com