First, the quality of wood must be guaranteed Hot and cold water pipes should ensure left-right and right-right cold, which is more in line with people's habits. In addition, the floor drain must use deodorant floor drain. When installing the PPR pipe and galvanized pipe, consider the thickness of the tile to ensure that the pipe will not be exposed. Three Tree Paint Air Conditioner Paint Socket Cement Latex Paint Switch Kitchen Door Plasterboard Ceiling Price Decoration Find Decoration Company Okay Technology Glass Glass Sliding Door Cabinet Door Mirror Headlight Marble Tile Kitchen & Bathroom Ceiling Glass Tile Marble Cabinet Kitchen Wall Tile Room Door Floor Tile Kitchen Cabinet Doors Glass Doors Kitchen Glass Sliding Doors Bathroom Tiles Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Door Size Bathroom Size Toilet Waterproof Price Bathroom Ceiling Bathroom Sliding Door Integral Toilet Bathroom Waterproof Bathroom Floor Tile Toilet Leaking Tiles Tile Price Tile Tile Tile Tile Kitchen Tile Fully Automatic Inspection Machine Fully Automatic Inspection Machine is a versatile solution that fuses ECT Inspection, Size Inspection, and Vision Inspection into a single, high-performance platform. At its core, the ECT Inspection module employs eddy current technology to non-destructively scan materials for subsurface flaws, cracks, or other imperfections. Complementing the ECT capabilities, the Size Inspection function utilizes precision sensors and software to measure dimensions with unparalleled accuracy. But what truly sets this machine apart is its Vision Inspection component. Integrating high-resolution cameras and sophisticated image processing algorithms, it conducts a thorough visual examination of products. From surface defects like scratches or discoloration to verifying logos, serial numbers, or packaging integrity, Vision Inspection ensures that every detail meets quality standards. ECT Inspection , Size Inspection ,Vision Inspection Shaoxing Sunfong Intelligent Equipment Inc. , https://www.zjsxsunfong.com
The quality and price of wood vary widely, and it is better to choose a material that is harder and less decaying.
The keel is best dried larch. The floor should be laid at 30 or 45 degrees, leaving 2 to 3 mm between the board and the board. Stitches should be staggered. 8 to 10 mm of stitches should be left between the floor and the wall. When the length of the composite floor exceeds 8 meters, the expansion joints must be considered. (At this point you can't use a composite baseboard, or you can't cover the seam). In addition, the experts also suggested that the door should be brushed up and down at the beginning and end of the paint, the bottom of the bathroom door cover should be brushed waterproof, do not do the dark track to do their own move the door, otherwise the maintenance is very troublesome. At the same time as little as possible with MDF door cover.
Second, there must be no two rows of bricks
Before the bricklayers are started, workers must first be checked to see if they have any empty drums or cracks. If they do, repair them first. Cement can not be used beyond the factory period of three months. Different types and grades of cement cannot be used. Sand must be used in sand. Wall tiles should be soaked in water for more than two hours. After drying, they can be posted. It would rather buy a few more pieces. Do not buy less, otherwise it will be a bad remedy if there is a color difference.
Special attention should be paid to the fact that one wall cannot have two rows of non-complete bricks, and the tiles should be cleaned immediately after the jointing is completed. The ground is paved with light-colored marble, stone back should remember to use white cement for anti-corrosion treatment, the angle of the corner to cut 45 degrees, the floor tiles must be dirty, non-slip, while leaning to the floor drain to avoid unnecessary water, wall The bricks must be cut in the form of cuts to meet the mouth of the pipe, so as to ensure that they look like solid bricks. Ground marble is best used in the form of dry shop, matt tiles difficult to clean, choose to be cautious. Also, the use of special floor tiles for balconies and floor tiles is very easy to do. At the same time, it is also necessary to pay attention to the drainage direction and avoid unnecessary troubles.
Third, water-based paint environmental stimulation low
Wood paint to choose those well-known brands of paint products, it is best not to blindly obey the decoration company or the foreman's recommendation. In the past two years, as people's awareness of environmental protection has increased, the amount of water-based paint used by brand companies is rapidly increasing. At present, the process of water-based paint has been greatly improved, but there are still weaknesses such as lack of fullness of the paint film, which you may choose at your own discretion.
The wall surface can be glued once again. The crevices on the walls are good, and the gypsum board seams are best. Partial dark and dark latex paint construction do not mix as much as possible, or prone to color, light, mercerized latex paint to be completed once, the second touch-up paint prone to color. It should be noted that the second pass must be carried out before the first pass, and it must be polished before the paint is completely dry.
When the door is painted, use a textured paper to cover the hinge and the door lock. When applying wallpaper, brush the oil on the wall, and remove the panel of the switch and socket. Use a putty after installing the skirting board. And make up the joints with latex paint, paint the construction of the metal surface must do anti-rust treatment, frosted glass to be covered in advance protection, stained with paint is difficult to handle.
Fourth, waterproof to do pressure test
Waterproof construction should be done with water-repellent coating as much as possible. The waterproof layer on the bathroom shower should not be less than 1.8m. It is best to make waterproof once in places such as floor drains, yin and yang angles, and pipes. The water pipes should not go from the ground as much as possible. The cold water pipes should have a 1cm protective layer in the wall. The hot water pipes should have a 1.5cm protective layer in the wall, so the tank should be deepened. Prior to sealing the tank, a pressure test must be conducted at a pressure higher than the daily constant to test whether the joint has leaked. After all concealed projects are completed and accepted, waterproof construction will be done. After completion of waterproof construction, secondary storage tests must be done.
Fifth, kitchen and toilet decoration other provinces small money
Kitchen and bathroom decoration must take into account practical features. Cooking is only a few minutes, and it takes a long time to wash the dishes. Therefore, the water bucket in the pool must be bought in large quantities, and the faucet and washbasin must be matched. Someone once bought a good-looking product, but it cannot be installed.
The installation of a whole kitchen cabinet will make the kitchen neat and the rails, hinges and other hardware must be used well. They will reduce a lot of collision noise and have a longer life. For the sake of safety, the upper end of the kitchen door is best equipped with a socket so that gas alarms can be placed in the future. This must not be saved. In addition, the non-return valve must be installed on the common flue to prevent odor in the kitchen.
If the bathroom is small, try to do the sliding door. Do not open the door; the mirror in the bathroom must first consider the size, otherwise the mirror light can be easily installed. The bathroom is best equipped with anti-fog mirrors and splash sockets. Well manhole. The Yuba should be mounted on the keel and cannot be mounted directly on the suspended ceiling. In addition, try not to change the toilet's launch position. The toilet can not be installed with cement, use silicone, if there is a problem can be disassembled.
Sixth, more and more switch sockets
Air conditioning holes should be considered outward, otherwise rainwater will come in. If your house has already made air-conditioned holes, consider whether the original air-conditioning holes are appropriate when you are making ceilings, or treat the suspended ceiling near the air-conditioner properly. Try to avoid exposing air conditioning lines.
Buy a washing machine to consider whether it is wall drainage or drainage. Electric water heaters and shower rooms with sauna function are the best choice 16A socket. The power outlet must be 300 mm from the ground, and the switch must be about 1.4 meters from the ground.
The Fully Automatic Inspection Machine streamlines inspection processes, reducing human intervention and enhancing productivity. It offers manufacturers a comprehensive solution for identifying and mitigating quality issues early in the production cycle, ultimately leading to cost savings, improved customer satisfaction, and a stronger brand reputation.