Factory Direct Metal Roof Anti-Corrosion Waterproof Coating Source Manufacturers

Model NO.: FYC
Certification: ISO14001, CCC, RoHS, ISO9001
Substrate: Steel
Components: Water Based
Formation Mechanism: Conversion Type
Solid Content: 69%
Tensile Strength: 1.5MPa
Trademark: fengyuan
Transport Package: Barrels
Specification: 25/20kg/barrel
Origin: China
Model NO.: FYC
Certification: ISO14001, CCC, RoHS, ISO9001
Substrate: Steel
Components: Water Based
Formation Mechanism: Conversion Type
Solid Content: 69%
Tensile Strength: 1.5MPa
Trademark: fengyuan
Transport Package: Barrels
Specification: 25/20kg/barrel
Origin: China
special metal roof used waterproof coatings

Factory Direct Metal Roof Anti-Corrosion Waterproof Coating Source Manufacturers

Product descriptions:
A high-quality waterproof coating made of pure acrylic emulsion, high-quality pigment and filler, supplemented with a waterproof system made of non-woven polyester fabric. The system can be a metal roofing lighting board.outstanding roofing ducts, fan ports, metal plate lap joints, reinforcement screws, gutters and other waterproof weak parts provide a complete solution with excellent fatigue resistance, aging resistance, low temperature flexibility and excellent elasticity. Metal roofing waterproofing expert. After the warranty expires, proper maintenance and repair can extend the warranty period.
Product Features :
Unique high elastic waterproof and holistic
High temperature resistance, low temperature resistance, good aging resistance
Good impact resistance, rust and corrosion resistance
Excellent metal adhesion (affinity), strong adhesion
Non-toxic, tasteless, non-polluting, green
Low temperature flexibility and high elasticity, excellent followability
Wide application and simple construction
The overall cost is low and the price is low.

Technical data:
No Test item I II
 1 Tensile strength Mpa ≥ 1.0  1.8
 2  Elongation at break % ≥       360
 3 Low temperature flexibility (round 10mm pole bend 180 degrees) -10degrees no crack -20degrees no crack
 4 Imperviousness(0.3Mpa,30min) impermeable
 5 Solid content% ≥ 72
 6 Dry time  h Face dry  ≤ 4
Real dry  ≤ 8
 7 Tensile strength retention after treatment% Heat treatment ≥ 80
Alkali treatment ≥ 60
Acid treatment ≥ 40
Artificial weathering treatment ≥   80-150
 8 Elongation at break after treatment% Heat treatment ≥ 200
Alkali treatment≥
Acid treatment≥
Artificial weathering treatment≥   200
 9 Heating rate
%
   elongation        ≤ 1.0
Shorten               ≤ 1.0
Application process
A: Metal roof lap joint: The metal roof lap joint is first coated with a base coat. When it is still wet, 15-20 cm wide non-woven polyester cloth is embedded in it, and then fully wetted with the base paint from above. Non-woven polyester cloth, even dry.
B metal roof protrusions (such as chimneys, vents, fan ports, etc.): cut non-woven polyester fabric of appropriate size and shape, and cut according to technical requirements, apply a layer of base paint around the protrusions, and cut it well. The non-woven polyester cloth is spread on it, and the non-woven polyester cloth is fully impregnated with the base paint from above to ensure no blistering and no wrinkles.
C metal roofing firmware: treated with 10CMX10CM non-woven polyester cloth in the same manner as above.
D metal roof gutter: Gutter lap joints, water outlets, etc. are first partially waterproofed with a metal roofing waterproofing system, then a layer of paint is applied over a larger waterproof area, and non-woven polyester is applied while it is still wet. The cloth is further wetted with the non-woven polyester cloth from the above, so that it is completely dry. After at least 12 hours, a layer of waterproof paste is finally applied.
E Apply two layers of surface coating in the area where the waterproof treatment is applied. The total coating coverage of the surface coating is 35 square meters / 20 liters (can be applied at one time, but it is recommended to apply the coating twice to keep the total coating rate unchanged) .
The coating rate of the single layer of F base coating is 40 square meters / 20 liters, and The utilization rate of the non-woven polyester cloth is 90%.
Construction Guide:
Identify areas that need to be waterproof:
Metal roofing generally requires waterproofing in the following areas: horizontal lap joint, vertical lap joint, fan joint, protruding roof duct, air conditioning duct, lighting board around, ridge, gutter, metal plate and daughter wall junction, screw firmware, etc. Metal roof waterproofing weak link.
Pretreatment:
Carefully inspect the metal roof before construction to ensure that the metal roof is firm, clean, free of rust, and free of frozen materials. If the above conditions are not met, the following treatments are made:
A Replace the rusted firmware and add the firmware in the appropriate location.
B Polish the rust area with rust-proof sandpaper until it is metallic, then apply a base coat.
C Remove frozen, dust and other dirt.
Factory Direct Metal Roof Anti-Corrosion Waterproof Coating Source Manufacturers


Factory Direct Metal Roof Anti-Corrosion Waterproof Coating Source Manufacturers
  special metal roof used waterproof coatings

Factory Direct Metal Roof Anti-Corrosion Waterproof Coating Source Manufacturers

Product descriptions:
A high-quality waterproof coating made of pure acrylic emulsion, high-quality pigment and filler, supplemented with a waterproof system made of non-woven polyester fabric. The system can be a metal roofing lighting board.outstanding roofing ducts, fan ports, metal plate lap joints, reinforcement screws, gutters and other waterproof weak parts provide a complete solution with excellent fatigue resistance, aging resistance, low temperature flexibility and excellent elasticity. Metal roofing waterproofing expert. After the warranty expires, proper maintenance and repair can extend the warranty period.
Product Features :
Unique high elastic waterproof and holistic
High temperature resistance, low temperature resistance, good aging resistance
Good impact resistance, rust and corrosion resistance
Excellent metal adhesion (affinity), strong adhesion
Non-toxic, tasteless, non-polluting, green
Low temperature flexibility and high elasticity, excellent followability
Wide application and simple construction
The overall cost is low and the price is low.

Technical data:
No Test item I II
 1 Tensile strength Mpa ≥ 1.0  1.8
 2  Elongation at break % ≥       360
 3 Low temperature flexibility (round 10mm pole bend 180 degrees) -10degrees no crack -20degrees no crack
 4 Imperviousness(0.3Mpa,30min) impermeable
 5 Solid content% ≥ 72
 6 Dry time  h Face dry  ≤ 4
Real dry  ≤ 8
 7 Tensile strength retention after treatment% Heat treatment ≥ 80
Alkali treatment ≥ 60
Acid treatment ≥ 40
Artificial weathering treatment ≥   80-150
 8 Elongation at break after treatment% Heat treatment ≥ 200
Alkali treatment≥
Acid treatment≥
Artificial weathering treatment≥   200
 9 Heating rate
%
   elongation        ≤ 1.0
Shorten               ≤ 1.0
Application process
A: Metal roof lap joint: The metal roof lap joint is first coated with a base coat. When it is still wet, 15-20 cm wide non-woven polyester cloth is embedded in it, and then fully wetted with the base paint from above. Non-woven polyester cloth, even dry.
B metal roof protrusions (such as chimneys, vents, fan ports, etc.): cut non-woven polyester fabric of appropriate size and shape, and cut according to technical requirements, apply a layer of base paint around the protrusions, and cut it well. The non-woven polyester cloth is spread on it, and the non-woven polyester cloth is fully impregnated with the base paint from above to ensure no blistering and no wrinkles.
C metal roofing firmware: treated with 10CMX10CM non-woven polyester cloth in the same manner as above.
D metal roof gutter: Gutter lap joints, water outlets, etc. are first partially waterproofed with a metal roofing waterproofing system, then a layer of paint is applied over a larger waterproof area, and non-woven polyester is applied while it is still wet. The cloth is further wetted with the non-woven polyester cloth from the above, so that it is completely dry. After at least 12 hours, a layer of waterproof paste is finally applied.
E Apply two layers of surface coating in the area where the waterproof treatment is applied. The total coating coverage of the surface coating is 35 square meters / 20 liters (can be applied at one time, but it is recommended to apply the coating twice to keep the total coating rate unchanged) .
The coating rate of the single layer of F base coating is 40 square meters / 20 liters, and The utilization rate of the non-woven polyester cloth is 90%.
Construction Guide:
Identify areas that need to be waterproof:
Metal roofing generally requires waterproofing in the following areas: horizontal lap joint, vertical lap joint, fan joint, protruding roof duct, air conditioning duct, lighting board around, ridge, gutter, metal plate and daughter wall junction, screw firmware, etc. Metal roof waterproofing weak link.
Pretreatment:
Carefully inspect the metal roof before construction to ensure that the metal roof is firm, clean, free of rust, and free of frozen materials. If the above conditions are not met, the following treatments are made:
A Replace the rusted firmware and add the firmware in the appropriate location.
B Polish the rust area with rust-proof sandpaper until it is metallic, then apply a base coat.
DIY Tool Cabinets

DIY tool cabinets are super hot online and they have mail order packings for safety in delivery.

Diy Tool Chest,Diy Tool Cabinets,Diy Mobile Tool Cabinet,Diy Tool Storage Cabinet

Changzhou Xingsheng Tianhe Electric Appliance Co., Ltd , https://www.roller-tool-cabinet.com