Wood flooring is the commonly used decorative material in the current home and public building decoration. It is necessary to establish basic requirements for the inspection and acceptance of wood floor coverings. Here are some acceptance methods for the laying of wooden flooring Material grades and grades of wood flooring are in line with the design requirements. The moisture content should be around 10, and whether the keel and stump should be pre-treated before laying and the wood keel should be installed firmly and straight, and the spacing and fixing method should meet the specification requirements. Stave nails are firm, no loosening, firm bonding, no emptying, and the type of glue used meets the specification requirements. The surface of the paved wooden floor was planed and polished, with no scars, russia and burrs. The pattern was clear, the color of the clean oil surface was the same, the laying direction was correct, the surface seams were tight, the joints were staggered, and the surface was clean. The skirting boards have tight joints, smooth surfaces, and a uniform height and wall thickness. With a 2-meter ruler check, the floor lay flatness error is less than 1 mm, the gap width is less than 0.3 mm, and the flatness error of laying on the baseboard mouth is less than 3 mm, and the patch straightness error is less than 2 mm. The common quality problems and treatment methods of wood floor construction laying The common quality problems in the laying of wooden floors are the sound of empty drums when walking, the unevenness of laying surfaces, lax seams, and local warping drums. (1) The sound of empty drums: The reason is that the laying of the wooden floor is not fixed. The main reason is that the number of the board and the keel, the board and the floor nails are not enough or the nails are not firm. Sometimes the shrinkage or glue is caused by the change of the moisture content of the board. Liquid failed. In addition to the strict acceptance of control methods, moisture content, adhesive and other quality, can only be used after acceptance, outside the installation should not be too little nails, and should ensure that the nails, after each laying a wooden floor, with no foot after the foot test sound loaded A piece, if any sound should be reworked immediately. (2) Uneven pavement surface: The main reason is that the laying of the grass roots is not flat or the wooden flooring strip deforms. During the construction of the paving, the horizontal ruler shall be used to check the level of the surface of the keel. If the paving is uneven, the paving shall be adjusted. Ventilation slots should be made on the keel. A 10 mm ventilation gap should be left on the edge of the wall. The insulation material must be dry to prevent arching after the floor is wet. The flatness of the wooden floor surface should be within 1 mm. (3) Slotless lacing: In addition to the non-standard laying during construction, the large width and size of the plate and the poor quality of the machine are also important reasons. In addition to careful inspection of the floor quality during the construction, the installation should be Meikou. To nail nails in front of the board and use the module to mold the floor gaps and nail them. (4) Partial warping drum: The main reason is that in addition to moisture deformation of the board, there are also small or seamless seams on the wool board, which is caused by the leakage of water in the floor and wet floors. In the construction period, 3 mm gap should be left when installing the wool board, and wooden keel carved ventilation slots. After the floor is covered, the paint on the floor paint should be complete. In daily use, water should be prevented from flowing into the lower part of the floor, and the surface water must be cleaned in time. Estimated construction period of wooden floor construction The laying of wooden floors is a very technical project and should not be paralleled with other projects. It usually takes one week to complete the construction task of three rooms and two halls, in which the wooden keel is installed and the base layer is protected from moisture for two days. The fur boards and the floor are installed for two days. The floor surface is polished and polished for one day, and the floor paint is applied for two days. The actual paving method requires less labor than the empty paving method, and the floor specifications are larger than those of the small-size ones. The elements of the quick-drying of the floor paint are slower than the elements and the specific time should be determined according to the construction method, materials, etc. Nature floor del floor paint decoration Container House,Container House For Workshop,Foldable Container House,Container House For Apartment HEBEI KAYI BUILDING MATERIAL TECHNOLOGY CO.,LTD , https://www.kayimesh.com