Cummins Parts,Cummins Spare Parts,Cummins Performance Parts,Original Cummins Parts JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsuloaderparts.com
The centralized clean-up and rectification adopts a comprehensive self-inspection of coal mining enterprises (principal enterprises), one-on-one inspections by cities and counties, and synchronous supervision by provincial governments, highlighting the "six key points" of coal mine safety, that is, licensing the transformation of production mines, and the integration and reconstruction of mines. , Gas control weak foundation mines, weak mines for the treatment of water disasters, coal mines management order and safety supervision "five people" team, the main content of the clean-up and rectification is whether there is interaction between production and construction of license-renovation production, transformation and construction of mine construction Whether or not unauthorized production is planned during the period, whether the mine has insufficient air volume or no wind and breeze operation on the mining work surface, whether the implementation of “first exploration, subsequent excavation, first exploration and subsequent mining†and water control measures are implemented, and whether the labor employment management achieves the “five reunification†And 35 cases in which the safety supervision "five persons group" performed safety supervision duties in accordance with the regulations, and if 35 cases were found, all were cleared and rectified, and the coal mines were ordered to suspend production or stop work or to retreat the "five-person group" personnel. In the absence of 35 kinds of situations, it is necessary to renovate the production mines and integrate and reconstruct the mines. Before August 25th and September 25th respectively, relevant information and safety production were submitted to the Municipal Bureau of Coal and the Municipal Coal Bureau for preliminary review and then submitted to the Provincial Coal Bureau for review. If the data was not reported overdue, the production system of the mine was closed and the production system was shut down. The licenses for coal production and other related licenses were revoked, reconstructed and transformed to construct the mine start-up report.
Jincheng Coal Industry Launches 100-Day Safe Production Concentration
In order to conscientiously implement the spirit of mobilizing the deployment meeting for the 100-day safe production activities in the province and city, and drawing lessons from the recent accidents to ensure the safe production of coal mines, the Municipal Coal Bureau decided to carry out a special operation for centralized cleaning and rectification of 100-day safe production in the local coal mines of the city starting from that day.