STP2: Assemble all the parts of the bottom basin, please make sure that there is no water accumulation in the bottom of the basin and the basin, and adjust the level of the bottom of the basin. The length of the hose can be adjusted arbitrarily according to the actual situation, and then the bottom of the basin and the floor drain are fixed, and a water test experiment is carried out. Before installing the room, please pay attention to protect the installed bottom.
STP3: Understand the situation of the hidden pipeline in the shower room as a whole, and determine the location of the wall drilling, you can choose to use a pencil and a horizontal ruler for precise positioning, and then use a hammer drill to drill the hole. Accurate punching position, reasonable installation of accessories, good waterproof and sealing work are the most important points of shower room installation, they are closely related to the safety of shower room. Put the rubber particles in the position of the drill hole, and tighten the aluminum strip on the wall with screws. During the installation process, please pay attention to continuous adjustment to ensure the verticality of the aluminum material.
STP4: When fixing the glass, the glass clamp should be tightly locked in the bottom hole, the flat glass and the curved glass should accurately fall into the bottom groove, and the whole is slowly pushed into the aluminum material attached to the wall, and then fixed with screws. After the glass is fixed, find out the drilling position above the glass, install the fixing base and connect the top tube, and fix the top with a curved tube sleeve.
STP5: Locate the device rack in the correct position, tighten the shelf nut, and fix the shelf glass. Under the aluminum material that fixes the glass, waterproof work should also be done. Immediately after the installation of the movable door of the shower room, the hinge needs to be installed at the position of the reserved hole of the movable door, and the shaft core is appropriately adjusted until the feeling of closing the door is the best.
STP6: Install the suction strip or water-repellent adhesive strip on the side or bottom of the glass as required. Note the use of silicone to seal the joints between aluminum and glass, basin bottom and wall. Finally, please check whether the various parts of the shower room are used normally, and adjust the problems if they are found.
At this point, a complete shower room installation is complete! Finally, remind again, remember to check the packaging and test the water test before installation, remember to be precise during the installation process and the second water test, after installation, all Seams must be sealed!
It is more comfortable to install the shower room like this
STP1: Before installing the shower room, please prepare the necessary tools and set them aside for easy use at any time. The first is the installation of the bottom basin. Before installation, you must check whether the packaging is complete, the parts inside are complete, and conduct a water test.