Floor heating installation acceptance process

In addition to professionals, I believe that the vast majority of owners do not know how to install the ground warmer, but also mention the acceptance work, and its experimental income is not as complicated as everyone thinks, the following are some of the major links.

There are many products involved in floor heating. In particular, some products are hidden under the concrete and can be particularly carefully checked.

Material acceptance

Inspect whether there is any error in the distribution of the floor heating in the drawings. The materials can be checked against the list for acceptance. The main point is to see if the material is missing, and verify the brand and origin, to avoid the possibility of the material being sent to the wrong due to negligence. Heaters will also send supervision to the site. .

In the case of bulk water collectors, if there is a missing part, the assembly process will be delayed.

The coils sent by the heating company are now basically a single circuit.

2. Construction acceptance

Floor heating is usually divided into two phases: pre-construction and later installation and commissioning. The construction phase can be completed within 1-2 days, including the laying of pipelines and the installation of water collectors, while the installation of heating furnaces and the commissioning of the systems are carried out until the later stages of renovation. The acceptance here is mainly for the pre-construction.

Check the corner insulation, which is the most easily lost heat.

The coil spacing is the same as the drawing, usually 20 or 16 centimeters.

After the floor heating is completed, it is necessary to use a pressure gauge to suppress and seal the pipe.

Unlike a single product, floor heating is a system and its stability is important.

3. System acceptance

The acceptance here can also be understood as commissioning. In the system commissioning, the supervisor will also record the parameters for future after-sales service. If the owner does not understand the system, he can consult in time, such as the intelligence of some thermostats. Programming settings and more.

During the acceptance process, engineers found problems with line connections and adjusted them.

Check the tightness of the pipe connections of the equipment and ensure the tightness.

The acceptance of the temperature controller in the acceptance of the owner is consistent with the design drawings.

Construction acceptance decoration design layout

Municipal Street Light

Municipal Street Light,Single-Head Garden Lamp,Double-Head Garden Lamp,Outdoor Street Light

Jiangsu chuanglv Transportation Facilities Co., Ltd , https://www.clsolarlights.com