There are many drainage pipes in the bathroom, and it is very important that the floor is waterproof, non-slip, and damp-proof on the roof. Experts in the bathroom pointed out the door for the "three defenses" project in the bathroom. Top moisture-proof cover treatment The bathroom is quite humid. At present, the general building is composed of a bathroom and a bathroom, so the bathroom is often surrounded by water vapor. Therefore, moisture protection at the roof is very important. To make the bathroom roof waterproof, it is best to apply a layer of water glass on the roof, and then use a waterproof PVC buckle plate. The gusset plate can be installed on the keel and can also cover the pipe. Try not to damage the original waterproof layer When the new building is delivered for use, the bathroom is generally treated with water, but the majority of the people will decorate the floor tile, level the ground, re-lay water pipes, which will destroy the original waterproof layer of the bathroom, so the waterproof layer of the bathroom is Make sure to redo waterproof when decorating. First level the ground with cement mortar, and then do a waterproof treatment. Clean the floor first, and brush repeatedly with polyurethane (water glass) waterproof coating 2 to 3 times. The joints between the wall and the ground and the pipe-ground joints between the upper and lower water are the most easily leaked places. We must urge the workers to handle these corners. The waterproof coating must be applied in place. The decoration team is required to provide cement mulch to the kitchen and toilet, and brush up 10 to 20 centimeters of polyurethane waterproof paint from the ground. Then the floor is redone with polyurethane waterproofing to enhance waterproofness. "Leakage test" test waterproof After the waterproof project is completed, close the door and the water outlet, fill the bathroom floor with water to a certain level, and make a mark. If there is no obvious drop in the liquid level within 24 hours, the roof of the house below the downstairs does not occur. Leakage, waterproof to be qualified. If the acceptance is unqualified, the waterproofing project must be redone and re-inspected. Do not ignore this link, a lot of road decoration team does not do waterproof, are done after the completion of glass glue, so that once the leak afterwards, and then it is too late to remedy, so waterproof experiments must be done. After confirming that there are no leaks, lay the tiles again. Bathrooms often have water, and it is easy to slip on them. Therefore, it is best to use non-slip tiles with raised patterns. This type of tiles not only has good waterproof performance, but it is not too slippery even in the case of water. . At the same time, the ground should be slightly inclined to the Floor drain to facilitate flushing. Experience decoration company entrance decoration glass coating cement bathroom glass brick glass door kitchen glass sliding door bathroom waterproof overall bathroom bathroom door bathroom leaking bathroom floor tile S.S Shower Hose,Hand Shower Hose,Stainless Steel Shower Hose,Handheld Shower Head Hose kaiping aida sanitary ware technology co.,ltd , https://www.kpaidafaucets.com