The history of hydropower reform

Online Diary:

The date of commencement of work was set on November 20th. The first phase was the transformation of hydropower. The waterway reconstruction was originally intended to use the water reform of Jinchao, but the old man insisted that the workers he knew could be given to us for free, and that it was used well. After comparing pipes, we still believed the words of the old man. The water reform used the people he recommended.

So hurriedly called to cancel the water reform, on the 20th of November started a long process of purchasing water pipes. Originally, labor costs for water reform saved money, and they wanted to buy better materials. With water workers going to the house, I had previously compared, and the home of Pythago may be the cheapest in the supermarket. But the price is indeed too expensive, more than 40 a 4-meter tube. The management of my house changed more, and eventually calculated according to this price, we have more than 2000 yuan, it is more than the budget, and after the comparison of the water industry, it also clearly told me that we can choose to make Jinde PPR, the quality is the most domestic OK, I also compared it, and finally decided to use Kinder's. It would save half the price.

Since the lines for water change are basically clear for each functional area, the lines have already been drawn, and after the exchanges with the hydraulic workers, they have done a trick, and after clarifying some issues, the water reform formally began. In the roar of the marble and electric hammers, one of the pipelines was opened. The parts involved in the load-bearing wall were unchanged, and all the pipelines followed the non-load-bearing walls.

The process of reforming the pipeline is basically smooth. Apart from the lack of some fittings in the middle and the purchase of materials, there are basically no major problems.

The transformation of electricity over there was done by Master Zhang. I didn't make many changes to my home appliances. I mainly added audio cables, and I moved several outlets to add TV points in restaurants. So it's relatively simple. All the lines were changed, and I asked Zhang to do all the formal requirements for electric changes. Seeing that his operation was basically very formal, he also felt relieved.

Last night, my father and mother ran for a day, and finally pulled the shield stone cement and sand in the hope, Oh, shield stone cement but my heart disease ah. After Master Zhang's inspection, this cement is really good. The people who sell cement and Zhongsha are quite good. They helped us to move the cement and sand upstairs. It was really a good person to come. Hopefully, our decoration will be able to meet good people everywhere.

TIPS:

1. Don't have joints in the part of the water pipe buried in the wall. It must be a complete pipe. Don't save this money. Do not bury the pipes in the ground. Instead, use a little pipe to pass through the ceiling, and do not put it underground.

2. After the water pipes are installed, you must suppress the test. If the installer you are looking for cannot do this, you must be careful and their installation may be problematic.

3, after the installation is complete, be sure to ask for a warranty book, if there is no after-sale guarantee, a problem is not easy to find someone to repair.

Hydropower renovation experience cement home TV decoration home improvement socket restaurant ceiling decoration home

KN95 Mask

Kn95 Mask,Kn95 3D Mask,Kn95 Face Mask,Kn95 Respirator

Ningbo Autrends Prevention Products Co., Ltd , https://www.autrendsafety.com