Many consumers believe that spring and autumn are the golden seasons for decoration and that construction in the summer is prone to problems. In fact, this argument is incorrect. The objective conditions of high summer temperatures and relatively volatile water are conducive to construction. In the summer construction, as long as the problems that should be paid attention in the summer are handled properly, the construction is carried out safely, reasonably, and efficiently, and every work is done according to the normal construction process and construction process, and the project that satisfies you can also be made. Summer decoration knowledge entrance decoration children's room decoration paint cement home window latex paint decoration decoration decoration company look good floor tile door exterior tile ceramic tile floor tile balcony tile decoration home Garage Door Intermediate Bearing Bracket Intermediate Bearing Bracket,Bearing Bracket For Door,Garage Door Intermediate Bearing Bracket,Connecting Rod Intermediate Bearing Bracket HANGZHOU KUNTAI HARDWARE CO., LTD. , https://www.hzktwj.com
Summer decoration five attention to give the tiles to drink water in the summer, because the material is more dry than usual, so for tiles, tiles and other materials that need to be treated with foam water, to extend the treatment time of the bubble water, so that it is fully close to saturation. In this way, it will not appear that when the adhesive is bonded to the cement due to the water absorption, the emptying and detachment occur.
Controlling the setting time The setting time should be strictly controlled when processing materials like gypsum. Because in the high-temperature dry weather, the molding of the gypsum is more difficult to control, so the setting time should be strictly controlled so that it can reach the standard compressive tensile strength and fineness.
Wall treatment must be clear When treating interior paints, due to the hot summer weather, special attention should be paid to their stability, bonding strength and initial dry crack resistance. The approach taken at this time is to carefully observe the details and make detailed time recordings before making comparisons.
Attention to the size of the thermal expansion and contraction in the plastic doors and windows, sliding door measurement and installation, in the size of the arrangement should pay attention to thermal expansion and contraction. Because steel is a material that is greatly affected by temperature, if it is too compact in size, it will have gaps and deformations due to lower temperatures in the winter, so there should be a slight surplus in size.
Pay attention to the compactness of the paving floor When paving the floor, the gap should be arranged more closely than before to prevent the gap from becoming larger and affecting the appearance when the temperature decreases. Floor and wall joints can be used to form transitions on the floor, this way, not only deal with the wall and floor gap is too large drawbacks, but also played a beautiful role.
Summer moisture-proof decoration is the key in the more humid and humid summer decoration, the key is moisture-proof. In summer, the air humidity is high, and some materials that easily absorb moisture, such as wood, boards, and gypsum board, are handled improperly in the transportation process and are prone to moisture. After the moisture in the material is exerted, it is easy to crack and deform, and it also affects other materials and affects the quality. When buying wood, you must go to a large wholesaler, because the wood of the large wholesaler has been dried. They directly pick up the goods from the container and reduce the intermediate links, thus reducing the chance of wood dampening. If the moisture-proof work is not handled well, it will be easy to happen when the dry monsoon blows, wood deformation, upturned floors, cracks on the walls, and dry paint. Summer heat, dry slowly after brushing paint. Moreover, the paint absorbs the moisture in the air and is also prone to fogging. The general practice of decoration companies is to use a drying agent to make the paint dry quickly.
In addition, the home improvement often encounters the problem of latex paint that is slow to dry and will smell mildew in hot and humid weather. In this regard, the general approach of the decoration company is to open the air-conditioning dehumidifiers and draw away the moisture from the air; the furniture cabinet door is not closed and the ventilation is maintained. After the renovation, you will also encounter various problems that cannot spread out and affect people's health. The decoration company's proposal is to put more green plants after the renovation, to play a role in light and the role of removing odors, or put two or three lemons or oranges, bananas in the room, can achieve rapid deodorization effect.
As for the cause of blackening caused by the balcony retaining wall, the main reason is that the outer wall of the rainy day is damp and the moisture slowly penetrates from outside the wall. After the protective paint on the wall is sealed, the moisture cannot be distributed to the outside, resulting in blackening. The paint film is curled up, so on the balcony as a protective wall, we must first do back surface treatment.