Four steps to installing a shower room

It’s time for everyone to enjoy the bath in the summer. At this time, all of our households have installed a whole bathroom. The whole bathroom installation is difficult for some people. Some don’t know where to install it. Some will not install at all, but don't worry about the installation of the following steps, I believe it will help everyone!

Integral shower room A steam-free generating unit consisting of a sprinkler, a shower enclosure, a shower screen, a top cover, a bottom basin or a bathtub. The basic structure of the shower room is the chassis and the fence. The chassis is mostly made of diamond, acrylic, glass steel and so on. Dimensions vary in size. 900 × 900mm, 1000 × 1000mm is more suitable for home use. The fence frame is mostly made of aluminum alloy, the outer layer is sprayed, and it is not rotted and rusted. The fence is equipped with PS plastic plate, FRP plate or tempered glass door and chrome-plated handle for easy access.

How to operate the whole shower room installation process? In fact, the glass used in the shower room is usually treated with physico-chemically treated tempered glass. After the glass is heated to a certain temperature, it is suddenly cooled. The tempered glass changes the crystal of the glass part. The structure improves the surface hardness, the impact resistance of the glass, and the bending strength is more than ten times higher than that of ordinary glass.

The whole shower room installation process one

Preparation and bottom basin installation, the bottom basin installation must be careful, testing water testing is an essential part, to see if the product packaging is complete, check whether its configuration is complete after opening. Prepare the necessary tools and put them together for easy access. Next, prepare to install the low basin, combine the bottom parts, adjust the level of the bottom basin, and ensure that there is no water in the basin or the bottom of the basin. The hose can be telescoped with distance. When the bottom of the basin is connected with the floor drain, it needs to be tested for water to ensure unimpeded water flow. The installed bottom basin should also be protected in time before the installation of the house.

The whole shower room installation process two

Clear the condition of the bathroom pipe to prevent the concealed pipeline from being blown when punching. Use a pencil and a level to determine the drilling position of the aluminum against the wall and punch the hole with a hammer drill. Whether the shower room is safe or not has an important relationship with whether the room is installed properly. Whether the hole is accurate, whether the fitting is tight or not, and whether the waterproof seal is good or not affects the normal use of the product. Knock on the rubber in the hole and lock the aluminum bar to the wall with screws. Note that it is necessary to adjust continuously while installing to maintain the verticality of the aluminum.

The whole shower room installation process three

When fixing the glass, lock the glass to the hole of the bottom basin, and drop the bottom of the flat glass or curved glass into the glass clip groove, and slowly push it into the wall aluminum. Fix it with screws. After fixing the glass, find the corresponding position above the fixed glass, install the (straight/oblique) fixing seat and connect the top tube. Secure it to the top of the glass with a bent sleeve. Align the position of the device rack, tighten the plate nut, and fix the laminate glass to maintain vertical and horizontal. Be careful to waterproof under the fixed glass of aluminum. Install the hardware of the movable door and install the hinges at the reserved holes of the fixed door. After installation, adjust the position of the shaft of the lotus leaf until the door feels the best.

Overall shower room installation process four

Install the suction strip or the water retaining strip on the side or below the glass as required. Use aluminum mesh to seal the seam between the aluminum and the wall, glass and bottom basin. Check that all parts are comfortable and smooth, and find problems in time. After adjusting, tighten the corresponding screws to make the whole shower room firmer. Wipe the entire shower room with a rag.

Compression/Tension Sensor

Tension & Compression Load Cells

Tension and compression load cells can be used to measure both tensile and compressive loads. Manufactured from stainless steel or aluminium alloy, these tension and compression load cells offer a high level of corrosive resistance for use in harsh environments with environmental sealing up to IP68. Available in capacities from 1kg to over 100 tonnes, all tension and compression load cells are supplied with a full certificate of calibration. Custom designed tension and compression load cells are also available, along with a wide variety of associated instrumentation.


Benefits:

  • High accuracy
  • Hassle free installation
  • Long term, reliable operation
  • Customisable

Compression Sensor,Tension Sensor,Compression And Tension Sensor,Compression/Tension Sensor

Zhejiang Nanhua Electronic Technology Co., Ltd , https://www.nhloadcells.com