1 material

Hydrant box and accessories, alarm button, galvanized steel pipe, butterfly valve.

2

tool

Threading machines, grinding machines, bench drills, electric hammers, hand wheels, hand drills, pipe clamps, etc.

3

Process

Installation Preparation Fire Hydrant Box Installation Pipes and Accessories Installation Box Accessories Installation       Hydrostatic test logo.

4

Process method

( 1 ) The model and specifications of indoor fire hydrants should meet the design requirements. The fire hydrant cabinet must meet the design requirements (its material is wood, iron and aluminum alloy, etc.), and the bolt valve has a single outlet and double outlets. All products should have a manufacturing license and certification of the fire department before they can be used.

( 2 ) The fire hydrant branch pipe should take the coordinates of the bolt valve, locate the swing at the elevation, check and stabilize the fire hydrant box, fix the box and fix the bolt, then install the bolt valve on the side of the box and open the box door. On one side, the door should be flexible after opening.

(3) fire hydrant plug port height from the ground surface layer is suitably 1. 10m, fire hydrant water Fang Xiangyi plug port provided downward or perpendicular wall hydrant. The center of the valve is 1. 2m away from the ground , and the allowable deviation is 20mm ; the valve is 140mm from the side of the box, 100mm from the back surface of the box, and the allowable deviation is 5mm . (The deviation can be written in the quality requirements.) The bottom of the box should be flush with the baseboard.

( 4 ) The indoor fire hydrants should be installed in the walls of the wall and equipped with glass doors for protection. If a fire hydrant box is used, the protruding part of the fire hydrant box should not affect the safety evacuation. The fire hydrant cabinet must meet the design requirements ( its material is wood, iron and aluminum alloy, etc. ) .

( 5 ) The fire hydrant branch pipe shall be positioned with the coordinates and elevation of the bolt valve. The fire hydrant box shall be secured and then fixed. After the cabinet is found to be stable, the bolt valve shall be installed. When the bolt valve is installed in the box, it shall be opened in the box door. On one side, the door should be flexible after opening.

( 6 ) Cabinet fittings should be installed before handing over. The fire hoses should be folded and placed on the pylon, tightly placed in the box ; the fire hose should be placed on the inside of the box, and the self-rescue gun and hose should be placed on the card or on the bottom of the box. Fire hoses and water guns, quick connector connection, generally with 14 # wire tied two, each not less than two laps, when using clamps, add a lead in the inside. When there is an electronically controlled button, attention should be paid to professional construction with electrical appliances.

( 7 ) There should be reinforcement measures for the fire hydrant cabinet installed on the light partition wall.

( 8 ) The button to activate the fire pump shall be located in the fire hydrant box or in the wall of the wall where the fire hydrant is installed.

( 9 ) After the installation of the fire hydrant pipe, the hydraulic pressure test is carried out according to the design pressure. If the design does not require the general working pressure is less than 1.0MPa , the test pressure is 1.4MPa . Working pressure is 1MPa or more, test pressure is working pressure plus 0.4MPa , pressure is 30 minutes, no leakage is qualified. In order to cooperate with the decoration, the pressure test can be carried out in sections.

( 10 ) After the pressure test of the fire hydrant system pipeline, the flushing work can be performed continuously. When the flushing water flow in the pipe meets the design requirements, the water quality at the inlet and outlet can be over.

5

Control points

Fire hydrant box installation location, bolt elevation location, appearance, logo.

6

Quality requirements

The bolt installation height is 1.1m , see the button on the opening , and the logo is eye-catching.

7

Detailed practice

The above is the specification for the installation of fire hydrant boxes. I hope everyone can better comply with the specifications during the installation process and apply them to life better, so that fire hydrant boxes can be better installed.

Some of the information in this article comes from the Internet and is reorganized and edited by China Rescue Equipment Network.

Waterproofing tapes

The XUNDA-T 500 Waterproofing tapes series is cold applied tape for both metallic pipelines and waterproofing works against outdoor bad weathers .

The PP Bitumen Tape shall be applied after the Liquid adhesive by hand or with a wrapping machine.

Structures

The specification of the tape consists of three layers,

Adhesive layer: Butyl rubber Bituminous Compound

Backing : PP woven fabric cloth

Interleaf:Adhesive Film Treated with Silicone

Features

_ Cold applied

_ Excellent self adhesion to pipe

_ Flexibility provides extra protection at vulnerable areas

_ Excellent conformability and consistent uniform thickness

_ Easily applied with no special equipment

_ Compatible with common pipe coatings

_ Excellent resistance to cathodic disbonding

Physical Properties:Tensile strength and so on , please send email to us


IMG_2194


Anticorrosion Waterproof Tape

Clear Waterproof Tape, Waterproof Adhesive Tape, Double Sided Waterproof Tape, Water Proof Tape

Jining Xunda Pipe Coating Materials Co.,Ltd , http://www.pipe-wrap.com