Do waterproof or mud wood first?

Most of the owners do not have decoration experience, so many places are in awe-inspiring. For example, in the end, when construction is done first, waterproof or mud-wood first? This is certainly not clear to everyone, today Xiao Bian gave everyone a little knowledge about the decoration, hoping to help everyone!

First, do waterproofing and caisson landfill work first

Waterproofing is very important. Home decoration must be done after the completion of the closed water test.

When the building is built, the toilet structure is partially or wholly lowered to a certain height of the corresponding floor, so the caisson type toilet is also called a sink-type toilet.

The process is first leveled with a cement mortar. The leveling here requires a certain slope, so that the later infiltrated water can be brought together. The screed should be flat and no trachoma. Then brush waterproof paint, brush the ground three times, the wall brush twice, the bathroom shower area brushing height of not less than 1.8 meters, other places not less than 30 cm. After it is dry, use a cement mortar to make a clay lintel, and then close the water test in a waterproof area. Pour water up to about 1 centimeter and the time is 48 hours. No leakage of ceiling water is found downstairs.

Then cloth drainage pipe, and reserve secondary drainage holes or secondary drainage floor drain. A pipe with a certain height can be fixed with the underlying tile. Then toilet caisson landfill, backfilled with ceramics. After surface leveling, steel or barbed wire needs to be added to the leveling layer to increase the strength of the surface layer. Brush twice more waterproof, and finally the subsequent tile laying work.

Second, mud and wood construction process

Mud and wood projects play a very important role in the entire renovation process. Mud and wood projects mainly include several major parts such as wall treatment, tiling, and wooden work.

The mason mainly has the basic treatment of the wall, the ground tiling, the putty of the wall, the stand-up pipe, the hole punching of the air conditioning pipe, etc. Each point has its own important points. Such as paving tiles have many stress, tile paving requires the brick surface is flat, neatly on the seams, Yang angle square, straight corner.

When paving, you should pay attention to the first paving wall tiles and then paving tiles. Before construction, it is necessary to know whether the geometry of the purchased bricks is standardized. After the wall tiles are pasted for four to five hours, the mortar in the brick surface shall be removed, and the jointing shall be done in a timely manner. The grout shall be adjusted to a paste and brush.

Carpentry engineering is the process of completing the construction of furniture doors and windows, plastering plaster line, partition production and ceiling keel in the decoration process. It is a process of portraying the "five features" of a house. Carpenters mainly have quasi-horizontal lines, ceilings, doors, window covers, pressing doors, furniture, and pressing cabinet doors.

Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).