Art permeable floor construction process, art permeable floor construction team where to find? Permeable floor construction program is divided into five steps, stirring → pouring → vibrating → rolling → curing, we will come to a detailed understanding of the pervious floor construction process. 1. Stirring: The consistency of the grout in the permeable floor mix is ​​relatively large, and the amount is small. In order to ensure that the grout can be uniformly wrapped on the aggregate, a forced mixer should be used, and the stirring time should be more than 5 minutes. 3. Vibrator: Do not strongly vibrate or compact during pouring. Flat-bed vibrators are generally used to gently oscillate the permeable concrete mixture, but care must be taken not to use high-frequency vibrators. Otherwise, he will make the concrete too dense to reduce the porosity and affect the permeability. At the same time, the high-frequency vibrator will also separate the cement slurry from the surface of the coarse aggregate and flow into the bottom to form an impervious layer, which will cause the material to lose its water permeability. Liaoning Plinde has detailed construction video of pervious floor. If you have any questions about construction of pervious water floor, please contact Liaoning Plinde. We will answer for you at the first time. 15998448444 Manager Peel Type Blind Rivets With Large Flange Peel Type Blind Rivets With Large Flange,Peel Type Blind Rivets Large Flange,Large Flange Peel Type Blind Rivets,Large Flange Peel Type Blind Rivet KD METALS (JINGJIANG) CO.,LTD , https://www.toprivet.com
2. Pouring: Before pouring, the roadbed must be wetted with water. Otherwise, the rapid loss of water on the permeable floor will weaken the bond strength between the aggregates. Since the permeable floor mixture is relatively hard, the well-mixed floor and good permeable floor materials can be paved on the roadbed.
4. Rolling: After vibrating, the solid steel pipe or light roller should be used to further compact the permeable concrete mix. Taking into account the consistency of the mix and the surrounding temperature, it may need to be rolled many times, but it should be noted that Roller must be cleaned before rolling to prevent sticking of aggregate.
5. Maintenance: Permeable floor due to the existence of a large number of holes, easy to lose water, drying quickly, so the maintenance is very important, especially early conservation, we must pay attention to avoid evaporation of large amounts of water in the floor. Usually pervious concrete takes less time than ordinary concrete to remove the mold, so that its sides and edges will be exposed to the air. Apply plastic film or color strips to cover the road and sides in time to ensure that the humidity and cement are fully hydrated. Permeable floor should be sprinkled and cured one day after pouring. The watering time of the permeable floor should be no less than 7 days.